CHINA - Knit Factory

Location: Taizhou City, China

PRODUCT INFORMATION

Knit Note: We do printing and embroidering at this location
Dress Blanket
Tops Pant
Coverall Bodysuit

Monthly Capacity by product type:

Blanket 5,000 Dz/month Dress 4,000 Dz/month
Pant 14,000 Dz/month Top 9,000 Dz/month
Coverall 3,500 Dz/month Bodysuit 13,000 Dz/month

Note: Same garment is produced in whole at this facility


Minimums & Lead Times
Minimum per run: 500Dz
Minimum per color: 300Dz
Production Lead Time: 5 Weeks
All Apparel Complete: 13 Weeks

Country/Port of Consolidation
Air: Shanghai Pudong or Hongqiao, Transit Time to Airport - 3.5 Hours
Port: Shanghai Port, Transit Time to Port - 3 Hours

Price Point - Competitive

RAW MATERIAL CAPABILITIES/HANDLING

Woven Fabric Capabilities
LIGHT WEIGHT MEDIUM WEIGHT
Jersey CVC Fleece
1x1 Rib Velour
  Interlock

- Capable of handling stretch fabric

Handling, Inspection & Storage
- Separate raw materials warehouse
- Piece goods are covered to prevent soiling
- Inspection Program - 20% checked (fabric flaws, width, shrinkage, crocking, shading)

PRODUCTION FACILITIES

Equipment
- Computer pattern making and grading
- Computer marker making
- File transmission capability
- 7 Cutting tables: 1.7 meters, manual spreading and cutting

Sewing
Type Brand
Single needle (lock) ZOLE BROTHER JUKI
Double needle YAMATO
4 Thread overlock PEGASUS SARURA ZOLE
Covering stitch YAMATO SARURA
Multi-need chainstitch YAMATO SARURA
Wastband setting KANSAI
Snap stitch CHENG HUAN TW RONGCHANG
Botton sewing BROTHER JUKI
Button-hole BROTHER

Pressing
Type Brand
Vacuum table  
Steam iron  

Embroider Data:
- Third party embroidery available
(PC control, case by case monthly capacity)

Laundry
- Laundry on site
Available Washes: Garment Wash, Stone Wash, Chemical Wash
Other: Overdyeing, Sandblasting, Enzyme Stone wash, Sand wash
- Good degree of laundry expertise, chemist on premises

Sample Making
- Sample Shop
- Average leadtime: 7 days at least
- Monthly Capacity: case by case

QUALITY ASSURANCE

Area
% Inspected or Level
What is Inspected
Fabric
4 Point System
Fabric flaws, width, shrinkage, shading
Cutting
AQL 2.5

BNP - Broken Needle Procedure

EMPLOYEES HEAD COUNT

Department # of People
Merchandising 5
Pattern Area 4
Cutting 12
Sewing/Kniting 218
Quality Assurance 4
Sample Making 8